Cherry Hill Bridge

Project Summary
Evergreen was contracted to consult and construct new infrastructure within the farm under emergency conditions. Ultimately, Evergreen removed and replaced an existing failed bridge, installed new utility conduits and a power vault.
Key Elements
- Temporary dam and diversion
- Emergency Bridge Replacement
- Utility Installation
Contracting Agency
Private
Industry Sector
Infrastructure
Location
Clackamas County, Oregon