East Fork Derry Dell Stabilization
Project Summary
Stormwater runoff within the East Fork Derry Dell had compromised public utility infrastructure through scour. Evergreen Developers removed hazard trees, dammed and diverted the Derry Dell, installed riffles, runs and beaver dam analogs while ultimately stabilizing 900′ of creek in a developed metropolitan area.
Key Elements
- Temporary dam and diversion
- Stream channel excavation
- Placing streambed materials
- Beaver Dam Analogs
- Hazard tree removal
Contracting Agency
City of Tigard
Industry Sector
Ecological Restoration, Stabilization, Infrastructure
Location
Tigard, Oregon