Evergreen Developers installed 1800 feet of 18” HDPE to replace an existing water supply damaged by wildfire. Working closely with archeological monitors, the ranch owner and USFS, the team was able to complete the work and ensure the land owners water permitting requirements were met.

Key Elements

  • Archeological site
  • Gravity flow water line
  • Private & Public Landowners